IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 334413 Semiconductor and Related Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0715 # 03 Y:2016 03 2016 USE SOLAR HEAT FOR HEAT $31,594 $151,288 Implemented
AM0715 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,530 $50,830 Implemented
AM0715 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,750 $50 Implemented
AM0715 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,830 $4,560 Implemented
AM0715 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $0 Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
AM0621 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,750 $11,600 Implemented
AM0621 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $1,000 Implemented
AM0515 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $66,000 $65,000 Implemented
AM0515 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,500 $6,700 Implemented
AM0515 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,580 $27,400 Implemented
AM0515 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $6,900 $80 Implemented
AM0515 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $4,440 $1,580 Implemented
AM0514 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,900 $500 Implemented
AM0514 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $1,450 Implemented
AM0514 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $2,520 $790 Implemented
AM0514 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $189,400 $50,000 Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented
TA0059 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,890 $200 Implemented