Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
411
matching recommendationsNAICS | 3345 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0461 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,372,930 | $1,150 | Implemented |
OR0461 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,290 | $2,690 | Implemented |
WI0471 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,303 | $15,076 | Implemented |
WI0471 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,108 | $59,785 | Implemented |
WI0471 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,338 | $800 | Implemented |
WI0471 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $319 | $640 | Implemented |
SD0341 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $200 | Implemented |
SD0341 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $965 | $400 | Implemented |
CO0544 # 01 Y:2004 | 01 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $152,970 | $140,000 | Implemented |
CO0544 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,600 | $300 | Implemented |
CO0544 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $310 | $250 | Implemented |
LM0071 # 03 Y:2004 | 03 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,163 | $945 | Implemented |
LM0071 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,330 | $1,200 | Implemented |
LM0071 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,879 | $0 | Implemented |
LM0071 # 07 Y:2004 | 07 | 2004 | MODIFY CURRENT INCENTIVE PROGRAM | $3,000 | $300 | Implemented |
LM0071 # 10 Y:2004 | 10 | 2004 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $84,322 | $100,000 | Implemented |
GT0745 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,387 | $5,000 | Implemented |
GT0745 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,711 | $0 | Implemented |
GT0745 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,124 | $12,499 | Implemented |
OK0665 # 01 Y:2003 | 01 | 2003 | INSTALL SET-BACK TIMERS | $4,895 | $664 | Implemented |
OK0665 # 04 Y:2003 | 04 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,748 | $3,480 | Implemented |
OK0665 # 05 Y:2003 | 05 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $10,600 | $0 | Implemented |
OK0665 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,550 | $13,880 | Implemented |
OK0665 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $1,048 | Implemented |
AS0354 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,918 | $4,500 | Implemented |