IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0592 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,190 $23,263 Implemented
NC0592 # 05 Y:2017 05 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $467 $25 Implemented
NC0592 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,944 $5,070 Implemented
NC0592 # 01 Y:2017 01 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,321 $14,000 Implemented
NC0592 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,653 $100 Implemented
NC0592 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $200 Implemented
NC0575 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,250 $500 Implemented
NC0575 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,087 $100 Implemented
NC0575 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $475 Implemented
NC0538 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $828 $100 Implemented
NC0538 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,767 Implemented
NC0528 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,097 $100 Implemented
NC0528 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,209 $1,935 Implemented
NC0528 # 09 Y:2014 09 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,119 $100 Implemented
NC0528 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,526 $100 Implemented
NC0528 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,799 $150 Implemented
NC0528 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $754 Implemented
NC0488 # 02 Y:2013 02 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,453 $300 Implemented
NC0488 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $100 Implemented
NC0488 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $600 Implemented
NC0488 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,980 $19,622 Implemented
TT0099 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,046 $1,000 Implemented
TT0099 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,777 $980 Implemented
TT0099 # 03 Y:2012 03 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,303 $10,800 Implemented
NC0449 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $883 $1,560 Implemented