IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1026 # 05 Y:2021 05 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $42,343 $88,894 Implemented
UD1026 # 02 Y:2021 02 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $174,302 $45,000 Implemented
UD1026 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,601 $0 Implemented
WV0514 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $842 $50 Implemented
WV0514 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $1,005 $256 Implemented
WV0514 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,663 $0 Implemented
WV0514 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,756 $420 Implemented
WV0514 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,361 $688 Implemented
UD0848 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $882 $300 Implemented
UD0848 # 07 Y:2012 07 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,543 $0 Implemented
UD0848 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,519 $5,000 Implemented
UD0712 # 07 Y:2005 07 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,166 $525 Implemented
UD0712 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $259 $1,000 Implemented
UD0712 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $8,635 $1,000 Implemented
UD0712 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,715 $60 Implemented
UD0712 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,839 $839 Implemented
UD0677 # 03 Y:2003 03 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $18,425 $0 Implemented
UD0677 # 05 Y:2003 05 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $17,000 $20,000 Implemented
UD0677 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,580 $53,130 Implemented
UD0677 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,700 $470 Implemented
UD0677 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $400 Implemented
UD0677 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $737 $200 Implemented
UD0672 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $218 Implemented
UD0672 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $963 $323 Implemented
UD0672 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,100 $136 Implemented