Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
307
matching recommendationsNAICS | 33531 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0558 # 07 Y:2024 | 07 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $474 | $2,500 | Implemented |
LE0558 # 06 Y:2024 | 06 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,995 | $37,000 | Implemented |
LE0558 # 05 Y:2024 | 05 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,840 | $18,014 | Implemented |
LE0558 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,010 | $1,600 | Implemented |
LE0558 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,863 | $5,799 | Implemented |
LE0558 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,762 | $1,400 | Implemented |
TT0302 # 05 Y:2023 | 05 | 2023 | METER WASTE WATER | $18,930 | $1,100 | Implemented |
TT0302 # 01 Y:2023 | 01 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $141,741 | $909,720 | Implemented |
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | Implemented |
UC2306 # 07 Y:2023 | 07 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,153 | $34,274 | Implemented |
UC2306 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,636 | $11,635 | Implemented |
UC2306 # 03 Y:2023 | 03 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $375 | $0 | Implemented |
MZ0337 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,106 | $2,400 | Implemented |
MZ0337 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $314 | $100 | Implemented |
MZ0337 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,895 | $9,731 | Implemented |
MZ0337 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,882 | $6,873 | Implemented |
MZ0337 # 06 Y:2023 | 06 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $150,000 | $75,650 | Implemented |
UU0218 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,861 | $721 | Implemented |
UU0218 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $512 | $161 | Implemented |
UU0218 # 02 Y:2023 | 02 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $7,404 | $5,700 | Implemented |
UU0218 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,223 | $53,198 | Implemented |
WV0637 # 06 Y:2023 | 06 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $502 | $617 | Implemented |
WV0637 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,065 | $3,353 | Implemented |
WV0637 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,462 | $188 | Implemented |
WV0637 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $164 | $483 | Implemented |