IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

404

matching recommendations
Reset
NAICS 3359 Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
TT0261 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $188,912 $733,702 Implemented
TT0261 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49,358 $3,200 Implemented
TT0261 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $26,082 $700 Implemented
TT0261 # 07 Y:2021 07 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,374 $0 Implemented
LE0502 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,768 $200 Implemented
LE0502 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $1,800 Implemented
LE0502 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,020 $17,500 Implemented
LE0502 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,993 $17,900 Implemented
MA0824 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,177 $29,750 Implemented
MA0824 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,118 $7,710 Implemented
MA0824 # 05 Y:2020 05 2020 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,491 $6,300 Implemented
OK1029 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,568 $2,250 Implemented
OK1029 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,684 $22,100 Implemented
OK1029 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,197 $30,672 Implemented
LE0483 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,574 $20,000 Implemented
LE0483 # 01 Y:2019 01 2019 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $200 $40 Implemented
MI0357 # 08 Y:2019 08 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $996 $2,040 Implemented
MI0357 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,267 $1,195 Implemented
MI0357 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,575 $160 Implemented
MI0357 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,870 $8,000 Implemented
MI0357 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,689 $1,980 Implemented
MI0357 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,306 $3,600 Implemented