IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 335932 Noncurrent-Carrying Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0013 # 07 Y:2023 07 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $720,000 $120,000 Implemented
NT0013 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,102 $0 Implemented
NT0013 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $17,430 $54,000 Implemented
NT0013 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $71,747 $106,919 Implemented
NT0013 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $21,512 Implemented
NT0013 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $49,000 $83,421 Implemented
TT0224 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,374 $16,645 Implemented
TT0224 # 01 Y:2019 01 2019 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $119,892 $51,560 Implemented
TT0224 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $14,353 $500 Implemented
TT0224 # 08 Y:2019 08 2019 USE OPTIMUM THICKNESS INSULATION $3,722 $10,752 Implemented
TT0224 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,405 $3,200 Implemented
SU0398 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,378 $5,201 Implemented
SU0398 # 01 Y:2015 01 2015 USE SYNTHETIC LUBRICANT $7,708 $0 Implemented
SU0362 # 06 Y:2014 06 2014 UPGRADE OBSOLETE EQUIPMENT $289 $1,250 Implemented
SU0362 # 03 Y:2014 03 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,404 $2,959 Implemented
SU0362 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,464 $1,840 Implemented
SU0362 # 01 Y:2014 01 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,295 $202 Implemented
SU0361 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,508 $849 Implemented
SU0361 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,075 $35,370 Implemented
SU0361 # 06 Y:2014 06 2014 UPGRADE OBSOLETE EQUIPMENT $512 $1,800 Implemented
SU0361 # 05 Y:2014 05 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,288 $2,716 Implemented
SU0361 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,756 $1,527 Implemented
SU0361 # 01 Y:2014 01 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,135 $0 Implemented
WV0330 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,602 $0 Implemented
WV0330 # 02 Y:2005 02 2005 ADD AREA LIGHTING SWITCHES $3,316 $1,325 Implemented