Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
300
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0490 # 05 Y:2014 | 05 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,052 | $10,000 | Implemented |
WV0490 # 06 Y:2014 | 06 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,812 | $500 | Implemented |
WV0490 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,569 | $3,905 | Implemented |
WV0490 # 08 Y:2014 | 08 | 2014 | REPLACE BOILER | $1,367 | $5,170 | Implemented |
UD0904 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,181 | $0 | Implemented |
UD0904 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,875 | $0 | Implemented |
UD0904 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $3,359 | $450 | Implemented |
UD0904 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,024 | $5,000 | Implemented |
UD0904 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,892 | $0 | Implemented |
UD0904 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,236 | $75,700 | Implemented |
UD0904 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $16,866 | $20,982 | Implemented |
UD0904 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,786 | $10,400 | Implemented |
UD0890 # 01 Y:2013 | 01 | 2013 | BURN A LESS EXPENSIVE GRADE OF FUEL | $544,478 | $0 | Implemented |
UD0890 # 03 Y:2013 | 03 | 2013 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $37,340 | $0 | Implemented |
UD0890 # 04 Y:2013 | 04 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $136,711 | $0 | Implemented |
UD0890 # 06 Y:2013 | 06 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,216 | $0 | Implemented |
UD0890 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $37,438 | $6,000 | Implemented |
UD0890 # 08 Y:2013 | 08 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,203 | $0 | Implemented |
UD0889 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,100 | $0 | Implemented |
UD0889 # 02 Y:2013 | 02 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $654 | $460 | Implemented |
UD0872 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $10,877 | $5,000 | Implemented |
UD0872 # 02 Y:2013 | 02 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $17,313 | $23,026 | Implemented |
UD0872 # 03 Y:2013 | 03 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $994 | $0 | Implemented |
UD0872 # 06 Y:2013 | 06 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $33,247 | $3,000 | Implemented |
UD0872 # 11 Y:2013 | 11 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,252 | $2,000 | Implemented |