Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,763
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0368 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $2,430 | $2,852 | Not Implemented |
UM0368 # 04 Y:2010 | 04 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,139 | $333,550 | Not Implemented |
UM0368 # 05 Y:2010 | 05 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,327 | $574 | Not Implemented |
UM0368 # 06 Y:2010 | 06 | 2010 | INSTALL STORM WINDOWS AND DOORS | $1,579 | $8,070 | Not Implemented |
UM0368 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,164 | $1,000 | Not Implemented |
MZ0049 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $823 | $300 | Implemented |
MZ0049 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,416 | $0 | Not Implemented |
MZ0049 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,012 | $0 | Implemented |
MZ0049 # 04 Y:2010 | 04 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $180 | $170 | Implemented |
MZ0049 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $5,075 | $6,650 | Implemented |
MZ0049 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,075 | $3,960 | Not Implemented |
MZ0049 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $217 | $150 | Implemented |
MZ0049 # 08 Y:2010 | 08 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,410 | $2,800 | Implemented |
MZ0049 # 09 Y:2010 | 09 | 2010 | COMBINE UTILITY METERS | $288 | $0 | Not Implemented |
MZ0049 # 10 Y:2010 | 10 | 2010 | REDUCE SCRAP PRODUCTION | $3,156 | $0 | Implemented |
MZ0049 # 11 Y:2010 | 11 | 2010 | USE OPTIMUM TEMPERATURE | $1,228 | $0 | Not Implemented |
MZ0049 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,900 | $37,600 | Implemented |
BD0379 # 01 Y:2010 | 01 | 2010 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $43,359 | $156,000 | Not Implemented |
BD0379 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $12,675 | $5,775 | n/a |
BD0379 # 03 Y:2010 | 03 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $10,691 | $14,000 | Not Implemented |
BD0379 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,550 | $8,550 | Not Implemented |
BD0379 # 05 Y:2010 | 05 | 2010 | USE SYNTHETIC LUBRICANT | $1,393 | $300 | Not Implemented |
BD0379 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $198 | $350 | n/a |
BD0379 # 07 Y:2010 | 07 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,893 | $300 | Not Implemented |
BD0379 # 08 Y:2010 | 08 | 2010 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $2,879 | $1,680 | n/a |