IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0368 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,430 $2,852 Not Implemented
UM0368 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,139 $333,550 Not Implemented
UM0368 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,327 $574 Not Implemented
UM0368 # 06 Y:2010 06 2010 INSTALL STORM WINDOWS AND DOORS $1,579 $8,070 Not Implemented
UM0368 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,164 $1,000 Not Implemented
MZ0049 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $823 $300 Implemented
MZ0049 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,416 $0 Not Implemented
MZ0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,012 $0 Implemented
MZ0049 # 04 Y:2010 04 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $180 $170 Implemented
MZ0049 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,075 $6,650 Implemented
MZ0049 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,075 $3,960 Not Implemented
MZ0049 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $217 $150 Implemented
MZ0049 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,410 $2,800 Implemented
MZ0049 # 09 Y:2010 09 2010 COMBINE UTILITY METERS $288 $0 Not Implemented
MZ0049 # 10 Y:2010 10 2010 REDUCE SCRAP PRODUCTION $3,156 $0 Implemented
MZ0049 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $1,228 $0 Not Implemented
MZ0049 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,900 $37,600 Implemented
BD0379 # 01 Y:2010 01 2010 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $43,359 $156,000 Not Implemented
BD0379 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $12,675 $5,775 n/a
BD0379 # 03 Y:2010 03 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,691 $14,000 Not Implemented
BD0379 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,550 $8,550 Not Implemented
BD0379 # 05 Y:2010 05 2010 USE SYNTHETIC LUBRICANT $1,393 $300 Not Implemented
BD0379 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $350 n/a
BD0379 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,893 $300 Not Implemented
BD0379 # 08 Y:2010 08 2010 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $2,879 $1,680 n/a