IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0810 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $7,399 $7,301 Not Implemented
GT0810 # 07 Y:2005 07 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $7,167 $14,160 Not Implemented
GT0810 # 08 Y:2005 08 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $25,152 $62,500 Not Implemented
UU0082 # 01 Y:2005 01 2005 USE CORRECT SIZE STEAM TRAPS $32,790 $20,000 Not Implemented
UU0082 # 02 Y:2005 02 2005 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $36,280 $0 Not Implemented
UU0082 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $784 $4,300 Not Implemented
UU0082 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $786 $600 Not Implemented
UU0082 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,720 $540 Not Implemented
IA0367 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $52 Implemented
IA0367 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $200 Implemented
IA0367 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $1,080 Implemented
IA0367 # 04 Y:2005 04 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $9,149 $0 Implemented
IA0367 # 05 Y:2005 05 2005 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $20,800 $1,046 Implemented
IA0367 # 06 Y:2005 06 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,840 Implemented
IA0367 # 07 Y:2005 07 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $650 $1,270 Implemented
IA0367 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,267 $14,500 Not Implemented
IA0367 # 09 Y:2005 09 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $8,580 $14,000 Not Implemented
IA0367 # 10 Y:2005 10 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,781 $500 Not Implemented
IA0367 # 11 Y:2005 11 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,202 $1,640 Not Implemented
IA0367 # 12 Y:2005 12 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,745 $28,000 Not Implemented
UM0286 # 01 Y:2005 01 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $9,539 $27,000 Not Implemented
UM0286 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,301 $13,476 Not Implemented
UM0286 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,775 $1,900 Implemented
UM0286 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,376 $450 Implemented
UM0286 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,619 $500 Not Implemented