IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

373

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0550 # 15 Y:2017 15 2017 INSULATE BARE EQUIPMENT $610 $1,042 Implemented
WV0550 # 16 Y:2017 16 2017 INSULATE BARE EQUIPMENT $496 $1,754 Implemented
TT0196 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $36,417 $148,815 Not Implemented
TT0196 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,605 $3,050 Implemented
TT0196 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $5,438 $19,250 Not Implemented
TT0196 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,985 $31 Not Implemented
TT0196 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,539 $1,150 Not Implemented
NC0597 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $74,459 $160,000 Not Implemented
NC0597 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $35,128 $100,000 Not Implemented
NC0597 # 04 Y:2017 04 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,207 $14,400 Not Implemented
NC0597 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,175 $3,200 Not Implemented
NC0597 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,985 $24,572 Not Implemented
BS0100 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,619 $437 Not Implemented
BS0100 # 02 Y:2017 02 2017 ELIMINATE/REDUCE AN OPERATION $247 $89 Not Implemented
BS0100 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $90 Not Implemented
BS0100 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $284 $39 Not Implemented
BS0100 # 05 Y:2017 05 2017 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $640 $8 Not Implemented
BS0100 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $80 $100 Not Implemented
BS0100 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,572 $14,699 Not Implemented
BS0100 # 08 Y:2017 08 2017 RECOVER WASTE HEAT FROM EQUIPMENT $488 $564 Not Implemented
BS0100 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,791 $16,366 Not Implemented
MA0781 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $285 $215 Implemented
MA0781 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,734 $2,724 Implemented
MA0781 # 03 Y:2017 03 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,896 $61,500 Not Implemented
MA0781 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $7,386 $6,000 Not Implemented