IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
NAICS 3361 Motor Vehicle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0550 # 13 Y:2017 13 2017 DEVELOP A REPAIR/REPLACE POLICY $2,757 $647 Implemented
WV0550 # 15 Y:2017 15 2017 INSULATE BARE EQUIPMENT $610 $1,042 Implemented
WV0550 # 16 Y:2017 16 2017 INSULATE BARE EQUIPMENT $496 $1,754 Implemented
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
BD0485 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $5,111 Implemented
BD0485 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,962 $350 Implemented
BD0485 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,599 $20 Implemented
UD0941 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0941 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,441 $0 Implemented
UD0941 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $41 $285 Implemented
UD0941 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $3,537 $50 Implemented
UD0941 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,067 $0 Implemented
UD0941 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $0 Implemented
UD0941 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,165 $35,457 Implemented
UD0941 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,738 $14,851 Implemented
NC0527 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,147 $140,860 Implemented
NC0527 # 02 Y:2014 02 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $23,485 $5,000 Implemented
NC0527 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,403 $100 Implemented
NC0527 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $13,647 $10,000 Implemented
NC0527 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,636 $1,503 Implemented
NC0527 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,768 $4,256 Implemented
AM0663 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,960 $24,700 Implemented