IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
NAICS 33612 Heavy Duty Truck Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0654 # 12 Y:2023 12 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $150 Implemented
WV0654 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $190 $98 Implemented
WV0654 # 14 Y:2023 14 2023 DEVELOP A REPAIR/REPLACE POLICY $282 $1,370 Implemented
WV0654 # 13 Y:2023 13 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $493 $1,500 Implemented
WV0654 # 07 Y:2023 07 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,242 $6,000 Implemented
WV0654 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $3,551 $9,700 Implemented
WV0654 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,126 $9,645 Implemented
WV0654 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $648 $3,230 Implemented
WV0654 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,093 $1,113 Implemented
WV0654 # 17 Y:2023 17 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $176 $240 Implemented
WV0654 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,126 $3,800 Implemented
WV0641 # 04 Y:2023 04 2023 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $42,136 $4,100 Implemented
WV0641 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $917 $933 Implemented
WV0641 # 06 Y:2023 06 2023 REDUCE VENTILATION AIR $16,843 $4,400 Implemented
WV0641 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,857 $5,425 Implemented
WV0641 # 09 Y:2023 09 2023 INSULATE BARE EQUIPMENT $402 $758 Implemented
UD1046 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,166 $0 Implemented
UD1046 # 13 Y:2022 13 2022 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $127,137 $75,000 Implemented
UD1046 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,214 $200,000 Implemented
UD1046 # 14 Y:2022 14 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $386,941 $554,028 Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented
WV0620 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,233 $660 Implemented
WV0620 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $2,785 $7,090 Implemented
WV0620 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,394 $7,905 Implemented
UF0572 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,950 $26,859 Implemented