IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 3362 Motor Vehicle Body and Trailer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0649 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,381 $528 Implemented
WV0649 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,665 $407 Implemented
WV0649 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,697 $13,390 Implemented
WV0649 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $6,156 $1,439 Implemented
WV0649 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,255 $3,000 Implemented
WV0649 # 05 Y:2023 05 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,620 $1,500 Implemented
WV0649 # 14 Y:2023 14 2023 INSTALL OCCUPANCY SENSORS $283 $608 Implemented
WV0649 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $19,114 $9,160 Implemented
UD1034 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,496 $1,515,645 Implemented
UD1034 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $573 $0 Implemented
UD1034 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,843 $0 Implemented
UD1034 # 01 Y:2022 01 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,472 $0 Implemented
UD1006 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $44,647 $16,500 Implemented
WV0562 # 03 Y:2018 03 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,359 $2,000 Implemented
WV0562 # 04 Y:2018 04 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,822 $0 Implemented
WV0562 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $6,713 $703 Implemented
WV0562 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $2,979 $1,328 Implemented
WV0562 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $543 $2,100 Implemented
WV0499 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $3,343 Implemented
WV0499 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $781 $569 Implemented
WV0499 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $792 $0 Implemented
WV0499 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,825 $20 Implemented
WV0499 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,878 $1,000 Implemented
WV0490 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,812 $500 Implemented
WV0490 # 05 Y:2014 05 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,052 $10,000 Implemented