IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
NAICS 33621 Motor Vehicle Body and Trailer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0499 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,878 $1,000 Implemented
WV0499 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $781 $569 Implemented
WV0499 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $792 $0 Implemented
WV0499 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,825 $20 Implemented
WV0499 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $3,343 Implemented
WV0490 # 01 Y:2014 01 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $10,882 $5,000 Implemented
WV0490 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,883 $16,722 Implemented
WV0490 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,449 $364 Implemented
WV0490 # 05 Y:2014 05 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,052 $10,000 Implemented
WV0490 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,812 $500 Implemented
WV0490 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,569 $3,905 Implemented
WV0490 # 08 Y:2014 08 2014 REPLACE BOILER $1,367 $5,170 Implemented
TT0126 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $5,874 $24,000 Implemented
TT0126 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,406 $7,500 Implemented
TT0126 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,851 $4,000 Implemented
TT0126 # 04 Y:2014 04 2014 DISCONNECT BALLASTS $346 $110 Implemented
TT0126 # 05 Y:2014 05 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $2,806 $4,900 Implemented
OK0872 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,779 $1,750 Implemented
OK0872 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $883 $689 Implemented
OK0872 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,899 $8,580 Implemented
OK0872 # 02 Y:2014 02 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,062 $780 Implemented
MZ0128 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,891 $1,160 Implemented
MZ0128 # 09 Y:2013 09 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $717 $2,000 Implemented
MZ0128 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,032 $90,880 Implemented
MZ0128 # 06 Y:2013 06 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,045 $150 Implemented