Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,344
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0904 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,181 | $0 | Implemented |
UD0904 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,875 | $0 | Implemented |
UD0904 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $3,359 | $450 | Implemented |
UD0904 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,024 | $5,000 | Implemented |
UD0904 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,892 | $0 | Implemented |
UD0904 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,236 | $75,700 | Implemented |
UD0904 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $16,866 | $20,982 | Implemented |
UD0904 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,786 | $10,400 | Implemented |
WV0487 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,990 | $7,560 | Implemented |
WV0487 # 05 Y:2014 | 05 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,081 | $1,000 | Implemented |
WV0487 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $5,633 | $2,520 | Implemented |
WV0487 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,533 | $0 | Implemented |
WV0487 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,002 | $3,401 | Implemented |
WV0487 # 10 Y:2014 | 10 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,857 | $570 | Implemented |
WV0487 # 11 Y:2014 | 11 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $1,698 | $1,760 | Implemented |
WV0487 # 12 Y:2014 | 12 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $1,457 | $1,334 | Implemented |
WV0487 # 13 Y:2014 | 13 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,419 | $70 | Implemented |
WV0487 # 16 Y:2014 | 16 | 2014 | INSULATE BARE EQUIPMENT | $564 | $2,006 | Implemented |
WV0487 # 17 Y:2014 | 17 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $534 | $792 | Implemented |
UA0117 # 03 Y:2014 | 03 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,760 | $21,000 | Implemented |
MA0726 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $608 | $500 | Implemented |
MZ0137 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,989 | $1,920 | Implemented |
MZ0137 # 03 Y:2014 | 03 | 2014 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $856 | $2,050 | Implemented |
MZ0137 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,610 | $0 | Implemented |
MZ0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $805 | $1,475 | Implemented |