IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0514 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $584 $687 Implemented
IA0514 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $140 Implemented
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $1,000 Implemented
IA0508 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $14,349 $3,750 Implemented
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
IA0436 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,733 $4,739 Implemented
IA0421 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $5,499 $675 Implemented
IA0421 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $950 $2,575 Implemented
IA0421 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $4,080 Implemented
IA0421 # 05 Y:2007 05 2007 MODIFY STARTUP/SHUTDOWN TIMES $2,951 $500 Implemented
IA0421 # 06 Y:2007 06 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,749 $60 Implemented
IA0421 # 07 Y:2007 07 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $1,093 $1,800 Implemented
IA0421 # 08 Y:2007 08 2007 MINIMIZE WATER USAGE $10,056 $400 Implemented
IA0418 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $456 $252 Implemented
IA0418 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $244 Implemented
IA0418 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $845 $770 Implemented
IA0418 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,939 $20,513 Implemented
IA0418 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $24 Implemented
IA0418 # 07 Y:2008 07 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,001 $788 Implemented
IA0418 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,360 $1,100 Implemented
IA0328 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $107 $145 Implemented
IA0328 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,948 $254 Implemented