Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0887 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,830 | $1,000 | Implemented |
AM0887 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,360 | $303 | Implemented |
AM0887 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,340 | $850 | Implemented |
AM0887 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $912 | $1,783 | Implemented |
NT0002 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,880 | $7,474 | Implemented |
NT0002 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $5,801 | Implemented |
NT0002 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,026 | $2,499 | Implemented |
NT0002 # 04 Y:2023 | 04 | 2023 | INSTALL SET-BACK TIMERS | $1,504 | $0 | Implemented |
NT0002 # 05 Y:2023 | 05 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,631 | $0 | Implemented |
TR0021 # 02 Y:2020 | 02 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $35,728 | $7,275 | Implemented |
TR0021 # 03 Y:2020 | 03 | 2020 | USE MECHANICAL STRIPPING METHODS | $2,731 | $666 | Implemented |
AM0742 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $880 | $5 | Implemented |
AM0742 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,650 | $600 | Implemented |
AM0742 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,300 | $0 | Implemented |
TR0003 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,843 | $2,000 | Implemented |
TR0003 # 07 Y:2017 | 07 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,954 | $10,000 | Implemented |
TR0003 # 05 Y:2017 | 05 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $24,242 | $38,964 | Implemented |
TR0003 # 04 Y:2017 | 04 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $74,012 | $15,000 | Implemented |
TR0003 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,044 | $64,592 | Implemented |
AM0726 # 02 Y:2017 | 02 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $1,200 | Implemented |
AM0726 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $13,440 | $1,904 | Implemented |
AM0726 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,305 | $6,120 | Implemented |
TA0079 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,280 | $720 | Implemented |
TA0079 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,490 | $200 | Implemented |
TA0079 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,450 | $720 | Implemented |