Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 33632 | Motor Vehicle Electrical and Electronic Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0508 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $6,113 | $6,000 | Implemented |
IA0508 # 02 Y:2013 | 02 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $14,349 | $3,750 | Implemented |
IA0508 # 03 Y:2013 | 03 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,845 | $1,000 | Implemented |
IA0508 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,758 | $976 | Implemented |
WV0474 # 10 Y:2013 | 10 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $407 | $500 | Implemented |
WV0474 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,986 | $15,864 | Implemented |
WV0474 # 03 Y:2013 | 03 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,698 | $1,000 | Implemented |
WV0474 # 05 Y:2013 | 05 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,920 | $72 | Implemented |
WV0474 # 06 Y:2013 | 06 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,715 | $392 | Implemented |
WV0474 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,586 | $324 | Implemented |
SU0289 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,383 | $578 | Implemented |
SU0289 # 07 Y:2010 | 07 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $528 | $714 | Implemented |
SU0289 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $1,653 | $1,236 | Implemented |
SU0289 # 03 Y:2010 | 03 | 2010 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,552 | $0 | Implemented |
SU0289 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,573 | $0 | Implemented |
SU0289 # 01 Y:2010 | 01 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,013 | $0 | Implemented |
TT0036 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,980 | $2,000 | Implemented |
TT0036 # 02 Y:2009 | 02 | 2009 | DISCONNECT BALLASTS | $3,640 | $0 | Implemented |
TT0036 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,660 | $800 | Implemented |
MS0283 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,008 | $50,375 | Implemented |
MS0283 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,338 | $247 | Implemented |
OK0699 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,446 | $23,400 | Implemented |
OK0699 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,780 | $6,150 | Implemented |
OK0699 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,145 | $24,175 | Implemented |
OK0699 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $18,681 | Implemented |