IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 33633 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0475 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,055 $1,160 Implemented
IA0475 # 02 Y:2012 02 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $1,377 $235 Implemented
IA0475 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $960 $433 Implemented
UA0059 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,193 $640 Implemented
UA0059 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,648 $2,500 Implemented
UD0835 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $25 Implemented
IA0418 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $456 $252 Implemented
IA0418 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $244 Implemented
IA0418 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $845 $770 Implemented
IA0418 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,939 $20,513 Implemented
IA0418 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $24 Implemented
IA0418 # 07 Y:2008 07 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,001 $788 Implemented
IA0418 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,360 $1,100 Implemented
TT0014 # 02 Y:2007 02 2007 APPLY FOR INVESTMENT INCENTIVES $21,551 $110 Implemented
TT0014 # 04 Y:2007 04 2007 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $44,581 $51,000 Implemented
TT0014 # 05 Y:2007 05 2007 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $159,283 $2,912 Implemented
UM0327 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,123 $9,375 Implemented
UM0327 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,516 $1,000 Implemented
UM0327 # 08 Y:2007 08 2007 COVER OPEN TANKS $561 $275 Implemented
UM0320 # 02 Y:2007 02 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,072 $0 Implemented
UM0320 # 04 Y:2007 04 2007 REVISE SMOKE CLEANUP FROM OPERATIONS $11,829 $1,846 Implemented
UM0320 # 05 Y:2007 05 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,797 $0 Implemented
UM0320 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $10,572 $19,721 Implemented
UM0320 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,938 $500 Implemented
UM0320 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $825 Implemented