Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,719
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0395 # 06 Y:2005 | 06 | 2005 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $7,600 | $380 | Not Implemented |
UM0278 # 01 Y:2005 | 01 | 2005 | COVER OPEN TANKS | $33,962 | $480 | Implemented |
UM0278 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,116 | $2,200 | Implemented |
UM0278 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,140 | $3,000 | Not Implemented |
UM0278 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $618 | $184 | Implemented |
UM0278 # 05 Y:2005 | 05 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $333 | $850 | Not Implemented |
UF0354 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,587 | $63,488 | Implemented |
UF0354 # 02 Y:2004 | 02 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $19,414 | $0 | Implemented |
UF0354 # 03 Y:2004 | 03 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,795 | $62,620 | Not Implemented |
UF0354 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,169 | $745 | Not Implemented |
UF0354 # 05 Y:2004 | 05 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $7,962 | $31,000 | Implemented |
UF0354 # 06 Y:2004 | 06 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,140 | $779 | Not Implemented |
UF0354 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,543 | $0 | Implemented |
UF0354 # 08 Y:2004 | 08 | 2004 | ADD AREA LIGHTING SWITCHES | $2,354 | $11,495 | Not Implemented |
UF0354 # 09 Y:2004 | 09 | 2004 | RECYCLE FLUORESCENT LAMPS | $2,883 | $3,496 | Not Implemented |
SU0200 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $470 | $0 | Not Implemented |
SU0200 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,068 | $375 | Implemented |
SU0200 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,047 | $169 | Implemented |
SU0200 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,439 | $1,636 | Implemented |
SU0200 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $327 | $374 | Implemented |
OK0697 # 01 Y:2004 | 01 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,600 | $0 | Implemented |
OK0697 # 02 Y:2004 | 02 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,218 | $100 | Not Implemented |
OK0697 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,032 | $1,400 | Not Implemented |
OK0697 # 04 Y:2004 | 04 | 2004 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $15,364 | $10,542 | Not Implemented |
OK0697 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $356 | $269 | Not Implemented |