IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

723

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0278 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $618 $184 Implemented
UF0354 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,587 $63,488 Implemented
UF0354 # 02 Y:2004 02 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,414 $0 Implemented
UF0354 # 05 Y:2004 05 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $7,962 $31,000 Implemented
UF0354 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,543 $0 Implemented
SU0200 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,068 $375 Implemented
SU0200 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,047 $169 Implemented
SU0200 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $9,439 $1,636 Implemented
SU0200 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $327 $374 Implemented
OK0697 # 01 Y:2004 01 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,600 $0 Implemented
OK0697 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $837 $730 Implemented
OK0697 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $360 Implemented
OK0697 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,392 $3,349 Implemented
MI0095 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,100 $144 Implemented
MI0095 # 08 Y:2004 08 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $458 $186 Implemented
CO0551 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,230 $60 Implemented
CO0551 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $320 Implemented
OR0466 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,000 $21,000 Implemented
MI0086 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $21,915 $2,300 Implemented
MI0086 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $2,300 Implemented
MI0086 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $792 $80 Implemented
MI0086 # 04 Y:2004 04 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $90,000 $50,000 Implemented
MI0086 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,490 $610 Implemented
MI0086 # 07 Y:2004 07 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $340 $386 Implemented
MI0086 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,615 $490 Implemented