IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
Reset
NAICS 33712 Household and Institutional Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0572 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,068 $18,390 Implemented
MA0572 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,923 $3,540 Implemented
MA0572 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $750 Implemented
MA0572 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,200 $2,830 Implemented
MA0572 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $644 $2,700 Implemented
MA0572 # 09 Y:2005 09 2005 REPAIR AND ELIMINATE STEAM LEAKS $160 $138 Implemented
NC0310 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $875 Implemented
NC0310 # 01 Y:2005 01 2005 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $167,500 $150,000 Implemented
NC0310 # 02 Y:2005 02 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $97,500 $61,250 Implemented
NC0310 # 03 Y:2005 03 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $60,000 $20,500 Implemented
NC0310 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,451 $3,000 Implemented
NC0310 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $509 $100 Implemented
LE0206 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,193 $5,000 Implemented
LE0206 # 03 Y:2005 03 2005 INSTALL BACK-UP EQUIPMENT $11,880 $14,100 Implemented
LE0206 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $200 Implemented
LM0089 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $380 Implemented
LM0089 # 05 Y:2005 05 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $26,400 $0 Implemented
LM0089 # 06 Y:2005 06 2005 MODIFY MATERIAL APPLICATION METHODS $7,090 $800 Implemented
NC0307 # 02 Y:2004 02 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $72,400 $49,500 Implemented
NC0307 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,171 $100 Implemented
LE0202 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,420 $13,640 Implemented
LE0202 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,378 $2,500 Implemented
LE0202 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $879 $0 Implemented
LE0202 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $397 $500 Implemented
LE0202 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $220 $0 Implemented