IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
NAICS 3372 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0115 # 01 Y:2005 01 2005 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $94,802 $420 Implemented
MI0115 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,435 $1,074 Implemented
MI0115 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,775 $6,660 Implemented
MI0115 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,997 $0 Implemented
TA0097 # 01 Y:2005 01 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $8,253 $0 Implemented
TA0097 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,341 $1,038 Implemented
TA0097 # 07 Y:2005 07 2005 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,904 $0 Implemented
BD0287 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $13,639 $248 Implemented
BD0287 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $9,255 $19,600 Implemented
BD0287 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,137 $1,500 Implemented
BD0287 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,661 $225 Implemented
BD0287 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $150 Implemented
BD0287 # 08 Y:2005 08 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $146 $0 Implemented
BD0287 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $894 $2,500 Implemented
BD0287 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
BD0287 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $564 $600 Implemented
BD0287 # 13 Y:2005 13 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $140 Implemented
IC0093 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,168 $3,600 Implemented
IC0093 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,546 $700 Implemented
IC0093 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
OK0696 # 01 Y:2004 01 2004 INSTALL SET-BACK TIMERS $19,051 $4,180 Implemented
OK0696 # 02 Y:2004 02 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $19,260 $5,950 Implemented
OK0696 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,876 $559 Implemented
OK0696 # 06 Y:2004 06 2004 PAY BILLS ON TIME TO AVOID LATE FEES $1,545 $0 Implemented
OK0696 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $700 $0 Implemented