IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
NAICS 337211 Wood Office Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0406 # 07 Y:2016 07 2016 REPLACE BOILER $8,344 $37,133 Implemented
SU0391 # 01 Y:2015 01 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $9,598 $5,243 Implemented
SU0391 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $716 $367 Implemented
SU0391 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $938 $1,414 Implemented
UA0094 # 06 Y:2013 06 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,212 $16,350 Implemented
UA0094 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $13,800 $8,100 Implemented
UA0094 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,762 $41,601 Implemented
UA0094 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $4,500 Implemented
UA0094 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,165 $800 Implemented
UA0094 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,672 $4,500 Implemented
WM0005 # 05 Y:2012 05 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,321 $95 Implemented
WM0005 # 07 Y:2012 07 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $982 $3,646 Implemented
WM0005 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $2,000 Implemented
WM0005 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,819 $200 Implemented
UA0045 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,354 $253 Implemented
UA0045 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $0 Implemented
UA0045 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $5,500 Implemented
UM0361 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,000 $31,000 Implemented
UM0361 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,484 $1,200 Implemented
UM0361 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,227 $650 Implemented
UM0361 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,137 $5,520 Implemented
UM0361 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,522 $600 Implemented
UM0361 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $396 $400 Implemented
UM0361 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $750 Implemented
UD0772 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,082 $161,076 Implemented