IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

230

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0405 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $3,954 $3,600 Implemented
MI0405 # 06 Y:2022 06 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $874 $900 Not Implemented
MI0343 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $236,442 $800,000 Implemented
MI0343 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,896 $6,486 Implemented
MI0343 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $7,675 Implemented
MI0343 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,421 $1,005 Not Implemented
MI0343 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,044 $2,973 Not Implemented
MI0343 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,400 $71,328 Implemented
MI0343 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $30,500 $3,280 Implemented
MI0343 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,079 $2,030 Implemented
MI0343 # 02 Y:2018 02 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $37,140 $43,838 Not Implemented
UF0518 # 01 Y:2018 01 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $24,028 $167,216 Implemented
UF0518 # 06 Y:2018 06 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $109,000 $41,200 Implemented
UF0518 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,145 $9,600 Implemented
UF0518 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Implemented
UF0518 # 03 Y:2018 03 2018 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,844 $586 Implemented
UF0518 # 02 Y:2018 02 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,684 $1,980 Implemented
MI0337 # 10 Y:2018 10 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,724 $7,314 Implemented
MI0337 # 02 Y:2018 02 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $41,184 $480 Implemented
MI0337 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,197 $11,846 Not Implemented
MI0337 # 04 Y:2018 04 2018 INSULATE BARE EQUIPMENT $26,104 $3,000 Implemented
MI0337 # 05 Y:2018 05 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $24,458 $31,600 Not Implemented
MI0337 # 06 Y:2018 06 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,780 $78,320 Not Implemented
MI0337 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,813 $2,030 Implemented
MI0337 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,349 $76,979 Implemented