IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0848 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,130 $26,000 Implemented
MA0848 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,335 $15,950 Implemented
MA0825 # 05 Y:2021 05 2021 MINIMIZE WATER USAGE $24,897 $6,250 Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented
MA0825 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $54,067 $150,000 Implemented
MA0825 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $93,702 $30,000 Implemented
MAS021 # 06 Y:2012 06 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,590 $3,120 Implemented
MAS021 # 05 Y:2012 05 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,883 $3,120 Implemented
MAS021 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,077 $8,000 Implemented
MA0582 # 08 Y:2005 08 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,340 $25,150 Implemented
MA0582 # 10 Y:2005 10 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,584 $1,300 Implemented
MA0582 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $800 Implemented
MA0582 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,815 $7,660 Implemented
MA0582 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,599 $2,010 Implemented
MA0582 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,153 $0 Implemented
MA0582 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,630 $6,540 Implemented
MA0582 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,163 $86,315 Implemented
MA0581 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,700 $18,200 Implemented
MA0581 # 11 Y:2005 11 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,467 $8,300 Implemented
MA0581 # 10 Y:2005 10 2005 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $5,166 $3,100 Implemented
MA0581 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,508 $160 Implemented
MA0581 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $10,675 $4,675 Implemented
MA0581 # 07 Y:2005 07 2005 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $10,812 $5,328 Implemented
MA0581 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,652 $18,550 Implemented