IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0993 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,531 $2,940 Implemented
UD0993 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,977 $9,300 Implemented
WV0485 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,805 $3,000 Implemented
WV0485 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $426 Implemented
WV0485 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $5,211 $2,981 Implemented
WV0485 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $175 Implemented
WV0485 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,516 $696 Implemented
WV0485 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,703 $500 Implemented
UD0771 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $0 Implemented
UD0771 # 09 Y:2007 09 2007 DISCONNECT BALLASTS $304 $0 Implemented
UD0768 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $860 $0 Implemented
UD0768 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $2,180 $0 Implemented
WV0360 # 06 Y:2007 06 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,399 $1,000 Implemented
WV0360 # 08 Y:2007 08 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,676 $3,700 Implemented
WV0360 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $25 Implemented
WV0360 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $300 Implemented
WV0360 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,426 $900 Implemented
WV0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $5,516 $1,900 Implemented
WV0360 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,938 $700 Implemented
UD0734 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $477 $275 Implemented
UD0734 # 05 Y:2006 05 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,510 $0 Implemented
UD0734 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $53 Implemented
UD0734 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,023 $1,900 Implemented
UD0734 # 07 Y:2006 07 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,798 $8,041 Implemented
UD0734 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,890 $19,500 Implemented