IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

366

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0120 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,836 $1,344 Implemented
TT0120 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $7,588 Implemented
DL0112 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,900 $40,000 Implemented
DL0112 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,034 $13,739 Implemented
CO0672 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $250 Implemented
UK1213 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,563 $4,550 Implemented
UK1213 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $654 $337 Implemented
UK1213 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $269 Implemented
UK1213 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,410 $26,824 Implemented
UK1213 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,324 $0 Implemented
DL0088 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $42,739 $100 Implemented
DL0088 # 03 Y:2012 03 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,620 $7,000 Implemented
DL0088 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $39,912 $100 Implemented
DL0088 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,935 $24,500 Implemented
DL0088 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $7,749 $100 Implemented
DL0088 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,010 $11,800 Implemented
UA0083 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,259 $39,310 Implemented
IA0479 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $2,675 $2,732 Implemented
IA0479 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,268 $549 Implemented
IA0479 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,057 $158 Implemented
IP0001 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,247 $0 Implemented
IP0001 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $93 $0 Implemented
IP0001 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,200 $8,348 Implemented
IP0001 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,942 $80,000 Implemented
MAS021 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,077 $8,000 Implemented