Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
157
matching recommendationsNAICS | 339991 | Gasket, Packing, and Sealing Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0581 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,675 | $4,675 | Implemented |
MA0581 # 09 Y:2005 | 09 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,508 | $160 | Implemented |
MA0581 # 10 Y:2005 | 10 | 2005 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $5,166 | $3,100 | Implemented |
MA0581 # 11 Y:2005 | 11 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,467 | $8,300 | Implemented |
UM0267 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,675 | $20,137 | Implemented |
UM0267 # 04 Y:2004 | 04 | 2004 | OPTIMIZE PLANT POWER FACTOR | $11,902 | $21,150 | Implemented |
UM0267 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,938 | $2,615 | Implemented |
SD0350 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,900 | $0 | Implemented |
SD0350 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,815 | $250 | Implemented |
SD0350 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,353 | $1,650 | Implemented |
SD0350 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,013 | $20,872 | Implemented |
SD0350 # 05 Y:2004 | 05 | 2004 | ADD AREA LIGHTING SWITCHES | $11,915 | $500 | Implemented |
LL0170 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,722 | $1,560 | Implemented |
AM0442 # 01 Y:2003 | 01 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $101,200 | $4,800 | Implemented |
AM0442 # 02 Y:2003 | 02 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $91,900 | $16,800 | Implemented |
AM0442 # 03 Y:2003 | 03 | 2003 | KEEP BOILER TUBES CLEAN | $12,600 | $500 | Implemented |
AM0442 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,700 | $21 | Implemented |
AM0442 # 05 Y:2003 | 05 | 2003 | KEEP BOILER TUBES CLEAN | $4,500 | $500 | Implemented |
AM0442 # 06 Y:2003 | 06 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $3,600 | $1,000 | Implemented |
AM0442 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,800 | $500 | Implemented |
AM0442 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $2,640 | $650 | Implemented |
AM0442 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $710 | $1,200 | Implemented |
AM0442 # 10 Y:2003 | 10 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $200 | $50 | Implemented |
SD0321 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,234 | $0 | Implemented |
SD0315 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,751 | $56 | Implemented |