IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0805 # 10 Y:2009 10 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,119 $0 Implemented
UD0805 # 11 Y:2009 11 2009 INSULATE BARE EQUIPMENT $3,797 $4,283 Implemented
UD0805 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,689 $0 Implemented
UD0805 # 14 Y:2009 14 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,965 $0 Implemented
UD0805 # 16 Y:2009 16 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,428 $1,000 Implemented
UD0805 # 18 Y:2009 18 2009 ISOLATE HOT OR COLD EQUIPMENT $666 $0 Implemented
UD0785 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $66,859 $121,500 Implemented
UD0785 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $98,908 Implemented
UD0785 # 07 Y:2008 07 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,742 $5,924 Implemented
UD0785 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 Implemented
UD0763 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,135 $5,242 Implemented
UD0763 # 02 Y:2007 02 2007 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,994 $8,900 Implemented
UD0720 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,769 $0 Implemented
UD0720 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $3,870 $6,000 Implemented
UD0720 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,757 $3,200 Implemented
UD0720 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,200 $225 Implemented
UD0720 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,280 $540 Implemented
UD0720 # 10 Y:2005 10 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,072 $2,000 Implemented
UD0720 # 11 Y:2005 11 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $554 $0 Implemented
UD0720 # 13 Y:2005 13 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $390 $0 Implemented
UD0720 # 15 Y:2005 15 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $200 $340 Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
WV0272 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $12,184 $721 Implemented
WV0272 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,265 $980 Implemented