IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0178 # 16 Y:1985 16 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $446 $0 Implemented
KU0154 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,380 $3,000 Implemented
KU0154 # 03 Y:1985 03 1985 INSTALL SET-BACK TIMERS $4,194 $1,052 Implemented
KU0154 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,813 $500 Implemented
KU0154 # 07 Y:1985 07 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $974 $0 Implemented
KU0154 # 08 Y:1985 08 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,887 $1,200 Implemented
KU0154 # 11 Y:1985 11 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $279 $0 Implemented
KU0154 # 12 Y:1985 12 1985 REPAIR AND ELIMINATE STEAM LEAKS $108 $50 Implemented
KU0156 # 02 Y:1985 02 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,544 $3,342 Implemented
KU0156 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,064 $2,200 Implemented
KU0156 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,611 $1,200 Implemented
KU0156 # 07 Y:1985 07 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,298 $1,200 Implemented
KU0129 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,368 $3,000 Implemented
KU0129 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,366 $0 Implemented
KU0129 # 05 Y:1984 05 1984 INSTALL TURBULATORS $7,337 $2,000 Implemented
KU0129 # 06 Y:1984 06 1984 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,922 $3,000 Implemented
KU0129 # 09 Y:1984 09 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $2,264 $2,500 Implemented
KU0129 # 10 Y:1984 10 1984 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $5,557 $300 Implemented
KU0129 # 12 Y:1984 12 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $3,565 Implemented
KU0129 # 13 Y:1984 13 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,710 $960 Implemented
KU0129 # 15 Y:1984 15 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $495 $500 Implemented
KU0129 # 16 Y:1984 16 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $283 $120 Implemented
KU0127 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,344 $2,000 Implemented
KU0127 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,100 $1,000 Implemented
KU0127 # 03 Y:1984 03 1984 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,518 $20,000 Implemented