IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0556 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,320 $2,320 Implemented
OR0556 # 07 Y:2010 07 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $11,734 Not Implemented
OR0556 # 08 Y:2010 08 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $16,479 $65,003 Not Implemented
MA0664 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $133,570 $55,950 Implemented
MA0664 # 02 Y:2010 02 2010 MINIMIZE WATER USAGE $26,438 $62,000 Not Implemented
MA0664 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,051 $34,000 Not Implemented
MA0664 # 04 Y:2010 04 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,890 $95,000 Not Implemented
MA0664 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,874 $18,345 Not Implemented
MA0664 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,084 $200 Implemented
SF0386 # 01 Y:2010 01 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,471 $0 Not Implemented
SF0386 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $4,307 $3,738 Not Implemented
SF0386 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $1,600 Not Implemented
SF0386 # 04 Y:2010 04 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,507 $7,500 Not Implemented
SF0386 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,553 $40,720 Not Implemented
SF0386 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $5,315 $18,821 Not Implemented
SF0386 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $217 $461 Not Implemented
TT0053 # 01 Y:2010 01 2010 ELIMINATE/REDUCE AN OPERATION $55,600 $0 Not Implemented
TT0053 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,700 $10,500 Implemented
TT0053 # 03 Y:2010 03 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,000 $10 Implemented
TT0053 # 04 Y:2010 04 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,700 $1,000 Implemented
TT0053 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $340 $520 Not Implemented
LE0298 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $77,015 $56,771 Not Implemented
LE0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,178 $100,000 Implemented
LE0298 # 03 Y:2010 03 2010 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $8,306 $20,000 Not Implemented
LE0298 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,050 $2,440 Implemented