IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0475 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $130 $0 Implemented
MA0471 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $7,546 $18,500 Not Implemented
MA0471 # 02 Y:2000 02 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,105 $11,000 Not Implemented
MA0471 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $2,804 $7,200 Not Implemented
MA0471 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,548 $4,000 Not Implemented
MA0471 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,361 $19,740 Not Implemented
MA0471 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $114 $120 Implemented
MA0468 # 01 Y:2000 01 2000 USE OTHER METHODS FOR NEUTRALIZATION $28,530 $100,000 Implemented
MA0468 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $17,250 $47,030 Not Implemented
MA0468 # 03 Y:2000 03 2000 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $390 $440 Implemented
MA0468 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $474 Implemented
MA0445 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $160,542 $811,250 Not Implemented
MA0445 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,122 $7,125 Not Implemented
MA0445 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,546 $472 Implemented
MA0445 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $353 $1,090 Implemented
MA0323 # 01 Y:1995 01 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,470 $4,000 Not Implemented
MA0323 # 02 Y:1995 02 1995 USE RADIANT HEATER FOR SPOT HEATING $1,300 $2,820 Not Implemented
MA0323 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $500 Implemented
MA0323 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $511 Not Implemented
MA0315 # 01 Y:1994 01 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $10,053 $33,627 Not Implemented
MA0315 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,672 $3,805 Not Implemented
MA0315 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,932 $1,776 Not Implemented
MA0315 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $1,678 Not Implemented
MA0315 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $1,350 $4,238 Not Implemented
MA0315 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $933 $0 Implemented