Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0607 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $43,000 $70,000 Not Implemented
OK0607 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,130 $10,700 Not Implemented
OK0607 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,830 $200 Implemented
OK0607 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $14,930 $30,000 Not Implemented
OR0385 # 03 Y:2000 03 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,231 $600 Implemented
OR0385 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $10,600 $58,000 Not Implemented
OR0385 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,053 $0 Not Implemented
OR0385 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,380 $0 Implemented
OR0385 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $670 $1,900 Not Implemented
OR0385 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,638 $10,431 Implemented
OR0385 # 02 Y:2000 02 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $9,076 $12,220 Not Implemented
GT0703 # 03 Y:2000 03 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,854 $3,000 Not Implemented
GT0703 # 01 Y:2000 01 2000 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $2,459 $0 Not Implemented
GT0703 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,855 $30,000 Implemented
GT0703 # 05 Y:2000 05 2000 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $17,878 $40,000 Not Implemented
GT0703 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $42,350 $8,000 Not Implemented
GT0703 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,031 $0 Not Implemented
GT0703 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,968 $0 Not Implemented
OR0382 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,050 $4,653 Not Implemented
OR0382 # 01 Y:2000 01 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $26,817 $900 Implemented
OR0382 # 06 Y:2000 06 2000 ELIMINATE A BY-PRODUCT $68,235 $2,000 Implemented
OR0382 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,241 $6,400 Not Implemented
OR0382 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,208 $26,491 Implemented
OR0382 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,194 $2,979 Not Implemented
BD0175 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $92,187 $250,000 Not Implemented