Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,408
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0294 # 11 Y:2002 | 11 | 2002 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,752 | $500 | Implemented |
IA0294 # 12 Y:2002 | 12 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $843 | $326 | Implemented |
IA0289 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,161 | $313 | Implemented |
IA0289 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,061 | $20 | Implemented |
GT0736 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $384 | $500 | Implemented |
GT0736 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $33,702 | $5,000 | Implemented |
GT0736 # 06 Y:2002 | 06 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,300 | $0 | Implemented |
GT0736 # 09 Y:2002 | 09 | 2002 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $8,580 | $0 | Implemented |
CO0495 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,590 | $17,000 | Implemented |
CO0495 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $1,860 | $500 | Implemented |
CO0495 # 03 Y:2001 | 03 | 2001 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $470 | $500 | Implemented |
CO0495 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $250 | $0 | Implemented |
CO0495 # 05 Y:2001 | 05 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $9,900 | $1,000 | Implemented |
GT0720 # 01 Y:2001 | 01 | 2001 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $337 | $1,000 | Implemented |
GT0720 # 02 Y:2001 | 02 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,475 | $600 | Implemented |
GT0720 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,472 | $6,151 | Implemented |
GT0720 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $277 | $324 | Implemented |
GT0720 # 07 Y:2001 | 07 | 2001 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,320 | $50 | Implemented |
LE0117 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,452 | $2,500 | Implemented |
LE0117 # 02 Y:2001 | 02 | 2001 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $1,140 | $300 | Implemented |
LE0117 # 03 Y:2001 | 03 | 2001 | IMPROVE LUBRICATION PRACTICES | $221 | $100 | Implemented |
LE0117 # 04 Y:2001 | 04 | 2001 | REPAIR OR REPLACE STEAM TRAPS | $644 | $1,300 | Implemented |
MA0491 # 01 Y:2001 | 01 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $20,600 | $10,000 | Implemented |
MA0491 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $800 | $100 | Implemented |
MA0491 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $500 | $150 | Implemented |