IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0064 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $204 $130 Implemented
NL0064 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $331 $90 Implemented
NL0064 # 04 Y:2022 04 2022 USE HIGH PRESSURE WASH SYSTEMS $768 $240 Implemented
NL0064 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $2,875 Implemented
NL0064 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,251 $1,729 Implemented
NL0064 # 01 Y:2022 01 2022 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $79,442 $292,000 Implemented
IA0523 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $189 $100 Implemented
IA0523 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $540 $1,680 Implemented
IA0523 # 03 Y:2014 03 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,851 $8,742 Implemented
IA0523 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,230 $125,850 Implemented
IA0442 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,623 $25 Implemented
IA0396 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $3,899 Implemented
IA0396 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $810 $83 Implemented
IA0396 # 08 Y:2006 08 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,234 $1,702 Implemented
IA0396 # 07 Y:2006 07 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,338 $500 Implemented
IA0396 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,836 $4,661 Implemented
IA0396 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,228 $600 Implemented
IA0380 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $262 $879 Implemented
IA0380 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $215 Implemented
IA0380 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $25 Implemented
IA0336 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $199 $80 Implemented
IA0336 # 01 Y:2004 01 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $3,854 $4,300 Implemented
IA0336 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,930 $20,000 Implemented
IA0336 # 03 Y:2004 03 2004 REPLACE BOILER $27,684 $150,000 Implemented
IA0336 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,139 $1,364 Implemented