Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0811 # 10 Y:2011 | 10 | 2011 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $22,682 | $0 | Implemented |
OK0811 # 03 Y:2011 | 03 | 2011 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,854 | $2,600 | Implemented |
OK0811 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $160 | $944 | Implemented |
OK0663 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $501 | $748 | Implemented |
OK0663 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $5,487 | Implemented |
OK0663 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $3,549 | $3,270 | Implemented |
OK0663 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,144 | $568 | Implemented |
OK0545 # 03 Y:1998 | 03 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $8,831 | $16,000 | Implemented |
OK0545 # 05 Y:1998 | 05 | 1998 | METER WASTE WATER | $11,868 | $0 | Implemented |
OK0518 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,774 | $17,415 | Implemented |
OK0518 # 02 Y:1997 | 02 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $7,965 | $5,000 | Implemented |
OK0518 # 04 Y:1997 | 04 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,330 | $0 | Implemented |
OK0518 # 06 Y:1997 | 06 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,220 | $2,561 | Implemented |
OK0489 # 02 Y:1996 | 02 | 1996 | USE SYNTHETIC LUBRICANT | $90 | $155 | Implemented |
OK0489 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $83 | $30 | Implemented |
OK0489 # 03 Y:1996 | 03 | 1996 | USE AUTOMATIC FLOW CONTROL | $16 | $46 | Implemented |
OK0483 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $434 | $1,779 | Implemented |
OK0483 # 06 Y:1996 | 06 | 1996 | BURN WOOD BY-PRODUCTS FOR HEAT | $28,560 | $29,500 | Implemented |
OK0483 # 02 Y:1996 | 02 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,400 | $0 | Implemented |
OK0483 # 03 Y:1996 | 03 | 1996 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,740 | $5,400 | Implemented |
OK0483 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $838 | $786 | Implemented |
OK0463 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,078 | $23,140 | Implemented |
OK0463 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,020 | $3,000 | Implemented |
OK0463 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,357 | $1,535 | Implemented |
OK0463 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,526 | $19,716 | Implemented |