IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0811 # 10 Y:2011 10 2011 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $22,682 $0 Implemented
OK0811 # 03 Y:2011 03 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,854 $2,600 Implemented
OK0811 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $160 $944 Implemented
OK0663 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $501 $748 Implemented
OK0663 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $5,487 Implemented
OK0663 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $3,549 $3,270 Implemented
OK0663 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,144 $568 Implemented
OK0545 # 03 Y:1998 03 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $8,831 $16,000 Implemented
OK0545 # 05 Y:1998 05 1998 METER WASTE WATER $11,868 $0 Implemented
OK0518 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,774 $17,415 Implemented
OK0518 # 02 Y:1997 02 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,965 $5,000 Implemented
OK0518 # 04 Y:1997 04 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,330 $0 Implemented
OK0518 # 06 Y:1997 06 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,220 $2,561 Implemented
OK0489 # 02 Y:1996 02 1996 USE SYNTHETIC LUBRICANT $90 $155 Implemented
OK0489 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $83 $30 Implemented
OK0489 # 03 Y:1996 03 1996 USE AUTOMATIC FLOW CONTROL $16 $46 Implemented
OK0483 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $434 $1,779 Implemented
OK0483 # 06 Y:1996 06 1996 BURN WOOD BY-PRODUCTS FOR HEAT $28,560 $29,500 Implemented
OK0483 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,400 $0 Implemented
OK0483 # 03 Y:1996 03 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,740 $5,400 Implemented
OK0483 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $838 $786 Implemented
OK0463 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,078 $23,140 Implemented
OK0463 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,020 $3,000 Implemented
OK0463 # 05 Y:1995 05 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $3,357 $1,535 Implemented
OK0463 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,526 $19,716 Implemented