IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0195 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,429 $11,536 Implemented
UA0195 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,476 $500 Implemented
AM0747 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,800 $121,500 Implemented
AM0747 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,900 $44,160 Implemented
AM0747 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $12,800 $39,100 Implemented
UA0188 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $1,389 $737 Implemented
UA0188 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,516 $500 Implemented
UA0188 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,745 $2,465 Implemented
NC0596 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,718 $100 Implemented
SF0502 # 06 Y:2017 06 2017 REDESIGN PROCESS $46,628 $18,660 Implemented
SF0502 # 08 Y:2017 08 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,335 $14,290 Implemented
SF0502 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $379,684 $84,889 Implemented
SF0502 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,648 $2,311 Implemented
SF0502 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,509 $80 Implemented
SF0502 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,288 $138,203 Implemented
SF0502 # 05 Y:2017 05 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $21,631 $14,971 Implemented
OK0914 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,340 $3,200 Implemented
OK0914 # 15 Y:2015 15 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,284 $1,600 Implemented
BS0039 # 07 Y:2014 07 2014 MINIMIZE WATER USAGE $535 $114 Implemented
BS0039 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $81 $87 Implemented
BS0039 # 05 Y:2014 05 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,992 $4,512 Implemented
BS0039 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $241 Implemented
BS0039 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $1,366 Implemented
BS0039 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $353 $214 Implemented
OK0884 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,165 $5,440 Implemented