IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0827 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,887 $3,400 Implemented
GT0827 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $158,948 $150,000 Implemented
GT0827 # 08 Y:2006 08 2006 METER WASTE WATER $81,583 $5,250 Implemented
GT0827 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $2,328 Implemented
GT0827 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $4,053 Implemented
GT0736 # 09 Y:2002 09 2002 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $8,580 $0 Implemented
GT0736 # 06 Y:2002 06 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,300 $0 Implemented
GT0736 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $33,702 $5,000 Implemented
GT0736 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $500 Implemented
GT0618 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $3,550 $3,450 Implemented
GT0618 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,175 $99,710 Implemented
GT0618 # 01 Y:1997 01 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,000 $2,000 Implemented
GT0618 # 04 Y:1997 04 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $149,009 $238,000 Implemented
GT0618 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $3,600 $3,000 Implemented
GT0528 # 07 Y:1994 07 1994 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $42,800 $45,000 Implemented
GT0528 # 05 Y:1994 05 1994 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,300 $10,000 Implemented
GT0528 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $730 $920 Implemented
GT0528 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,540 $15,210 Implemented
GT0447 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $754 $150 Implemented
GT0447 # 05 Y:1991 05 1991 HEAT WATER WITH EXHAUST HEAT $60,730 $125,000 Implemented
GT0447 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,147 $5,838 Implemented
GT0447 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $534 $1,330 Implemented
GT0447 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,880 $500 Implemented
GT0392 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $3,680 $2,110 Implemented
GT0392 # 06 Y:1989 06 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,490 $375 Implemented