IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

267

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0256 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $236 $93 Implemented
GT0640 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $28,530 $45,720 Implemented
GT0640 # 02 Y:1998 02 1998 COMBINE UTILITY METERS $5,560 $0 Implemented
GT0640 # 04 Y:1998 04 1998 UPGRADE CONTROLS ON COMPRESSORS $7,000 $5,000 Implemented
GT0640 # 06 Y:1998 06 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,660 $5,675 Implemented
GT0640 # 07 Y:1998 07 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,741 $7,900 Implemented
GT0640 # 08 Y:1998 08 1998 METER WASTE WATER $7,180 $8,000 Implemented
ME0251 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $2,487 $600 Implemented
ME0251 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,240 $2,100 Implemented
ME0251 # 04 Y:1998 04 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,020 $400 Implemented
ME0251 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $448 $0 Implemented
ME0251 # 06 Y:1998 06 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $160,875 $31,200 Implemented
ME0248 # 02 Y:1998 02 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,099 $0 Implemented
ME0248 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,127 $6,773 Implemented
ME0248 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,421 $1,958 Implemented
ME0248 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,754 $750 Implemented
ME0248 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,270 $500 Implemented
ME0248 # 08 Y:1998 08 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,979 $4,070 Implemented
ME0248 # 09 Y:1998 09 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $550 $1,900 Implemented
CO0381 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,914 Implemented
CO0381 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $179 $602 Implemented
CO0381 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $190 Implemented
CO0381 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,550 $12,500 Implemented
CO0381 # 06 Y:1997 06 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $75,250 $320,000 Implemented
AM0283 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $43,960 $40,000 Implemented