IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0377 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,088 $120 Implemented
AS0377 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $5,750 Implemented
AS0377 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,140 $20 Implemented
AS0377 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $1,236 $30 Implemented
AS0377 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $401 $816 Implemented
AS0377 # 06 Y:2004 06 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $193 $344 Implemented
AS0377 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $331 $200 Implemented
AS0377 # 08 Y:2004 08 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,085 $40 Implemented
AS0377 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $156,863 $200,000 Implemented
MI0074 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,720 $2,100 Implemented
MI0074 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,422 $2,605 Implemented
MI0074 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $680 $278 Implemented
MI0074 # 06 Y:2004 06 2004 KEEP BOILER TUBES CLEAN $18,447 $30,050 Implemented
SF0275 # 02 Y:2004 02 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $49,562 $39,000 Implemented
SF0275 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,238 $0 Implemented
SF0275 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,909 $3,688 Implemented
SF0269 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $635 $0 Implemented
SF0269 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,653 $0 Implemented
WV0246 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,539 $0 Implemented
WV0246 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,277 $240 Implemented
WV0246 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,200 $400 Implemented
WV0246 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $3,472 $2,563 Implemented
WV0246 # 10 Y:2002 10 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $458 $830 Implemented
WV0246 # 12 Y:2002 12 2002 PAY BILLS ON TIME TO AVOID LATE FEES $2,301 $0 Implemented
WV0246 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $0 Implemented