Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
644
matching recommendationsSIC | 2026 | Fluid Milk |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0375 # 09 Y:2000 | 09 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $300 | $0 | Implemented |
MA0458 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,885 | $6,215 | Implemented |
MA0458 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $1,161 | $600 | Implemented |
MA0458 # 04 Y:2000 | 04 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $963 | $400 | Implemented |
MA0458 # 05 Y:2000 | 05 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $757 | $1,000 | Implemented |
UD0586 # 04 Y:2000 | 04 | 2000 | MINIMIZE WATER USAGE | $18,654 | $298 | Implemented |
UD0586 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,183 | $0 | Implemented |
IA0235 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,832 | $0 | Implemented |
IA0235 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $554 | $43 | Implemented |
IA0235 # 10 Y:1999 | 10 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $995 | $1,046 | Implemented |
AM0311 # 02 Y:1998 | 02 | 1998 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $31,316 | $0 | Implemented |
AM0311 # 04 Y:1998 | 04 | 1998 | USE PHOTOCELL CONTROLS | $11,300 | $340 | Implemented |
AM0311 # 06 Y:1998 | 06 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $2,170 | $0 | Implemented |
AM0311 # 07 Y:1998 | 07 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,620 | $1,010 | Implemented |
AM0311 # 08 Y:1998 | 08 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,500 | $2,100 | Implemented |
AM0311 # 10 Y:1998 | 10 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,105 | $1,205 | Implemented |
OD0096 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,200 | $7,460 | Implemented |
OD0096 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,120 | $7,145 | Implemented |
OD0096 # 03 Y:1997 | 03 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,350 | $0 | Implemented |
OD0096 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $298 | $449 | Implemented |
OD0096 # 05 Y:1997 | 05 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,369 | $40 | Implemented |
OD0096 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,950 | $1,495 | Implemented |
OD0096 # 08 Y:1997 | 08 | 1997 | ADOPT IN-HOUSE MATERIAL GENERATION | $936,000 | $1,000,000 | Implemented |
OR0309 # 03 Y:1997 | 03 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $1,880 | $0 | Implemented |
OR0309 # 05 Y:1997 | 05 | 1997 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $34,550 | $24,000 | Implemented |