IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0252 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,132 $2,132 Implemented
IA0252 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $909 $775 Implemented
IA0252 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $649 $374 Implemented
AM0375 # 01 Y:2000 01 2000 MINIMIZE WATER USAGE $13,250 $3,170 Implemented
AM0375 # 02 Y:2000 02 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,590 $500 Implemented
AM0375 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $5,500 $10,990 Implemented
AM0375 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,180 $300 Implemented
AM0375 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $720 Implemented
AM0375 # 07 Y:2000 07 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $835 $0 Implemented
AM0375 # 08 Y:2000 08 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $500 $1,060 Implemented
AM0375 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $300 $0 Implemented
MA0458 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,885 $6,215 Implemented
MA0458 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $1,161 $600 Implemented
MA0458 # 04 Y:2000 04 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $963 $400 Implemented
MA0458 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $757 $1,000 Implemented
UD0586 # 04 Y:2000 04 2000 MINIMIZE WATER USAGE $18,654 $298 Implemented
UD0586 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,183 $0 Implemented
IA0235 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,832 $0 Implemented
IA0235 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $43 Implemented
IA0235 # 10 Y:1999 10 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $995 $1,046 Implemented
AM0311 # 02 Y:1998 02 1998 CHECK FOR ACCURACY OF UTILITY / POWER METERS $31,316 $0 Implemented
AM0311 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $11,300 $340 Implemented
AM0311 # 06 Y:1998 06 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $2,170 $0 Implemented
AM0311 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,620 $1,010 Implemented
AM0311 # 08 Y:1998 08 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,500 $2,100 Implemented