IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,378

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0405 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,215 $62,332 Implemented
MI0211 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $25,532 $213,119 Implemented
MI0211 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,191 $41,400 Implemented
MI0211 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,111 $1,320 Implemented
MI0211 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,771 $1,950 Implemented
MI0211 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,618 $50 Implemented
MI0211 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,438 $4,571 Implemented
UM0394 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Implemented
UM0394 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Implemented
MI0210 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,805 $1,320 Implemented
MI0210 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,730 $26,000 Implemented
MI0210 # 06 Y:2011 06 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,125 $133,000 Implemented
MI0210 # 10 Y:2011 10 2011 USE RADIANT HEATER FOR SPOT HEATING $8,346 $10,000 Implemented
MI0210 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,145 $8,889 Implemented
MI0210 # 12 Y:2011 12 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,455 $2,425 Implemented
SD0436 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,198 $2,100 Implemented
SD0436 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,180 $2,000 Implemented
SD0436 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $7,888 $6,050 Implemented
SD0436 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,787 $1,535 Implemented
SD0436 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,598 $52,274 Implemented
SD0436 # 07 Y:2011 07 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $12,828 $20,000 Implemented
WV0429 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,791 $547 Implemented
WV0429 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,932 $3,252 Implemented
WV0429 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,606 $7,343 Implemented
WV0429 # 12 Y:2011 12 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $562 $256 Implemented