Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,378
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0044 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,476 | $4,900 | Implemented |
LL0322 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,918 | $4,600 | Implemented |
LL0322 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $30 | Implemented |
LL0322 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $460 | $120 | Implemented |
TT0041 # 01 Y:2009 | 01 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,330 | $0 | Implemented |
TT0041 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,503 | $0 | Implemented |
TT0041 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,050 | $0 | Implemented |
SD0419 # 01 Y:2009 | 01 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,800 | $10,000 | Implemented |
SD0419 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,170 | $1,000 | Implemented |
SD0419 # 04 Y:2009 | 04 | 2009 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,940 | $2,263 | Implemented |
SD0419 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,905 | $161,162 | Implemented |
TT0038 # 02 Y:2009 | 02 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $21,918 | $10,000 | Implemented |
TT0038 # 05 Y:2009 | 05 | 2009 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,893 | $0 | Implemented |
TT0038 # 07 Y:2009 | 07 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,036 | $1,600 | Implemented |
TT0038 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,000 | $4,900 | Implemented |
SF0374 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $45,410 | $0 | Implemented |
SF0374 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,699 | $0 | Implemented |
SF0374 # 03 Y:2009 | 03 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,627 | $2,372 | Implemented |
SF0374 # 04 Y:2009 | 04 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,963 | $2,837 | Implemented |
SF0374 # 05 Y:2009 | 05 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,402 | $3,037 | Implemented |
SF0374 # 06 Y:2009 | 06 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,888 | $9,574 | Implemented |
SF0374 # 07 Y:2009 | 07 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,939 | $12,500 | Implemented |
SF0374 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,237 | $33,968 | Implemented |
SF0374 # 09 Y:2009 | 09 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $51,835 | $40,007 | Implemented |
SF0374 # 10 Y:2009 | 10 | 2009 | USE PHOTOCELL CONTROLS | $18,403 | $18,196 | Implemented |