IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0459 # 01 Y:2004 01 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,500 $10,500 Not Implemented
OR0457 # 06 Y:2004 06 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,520 $300 Implemented
OR0457 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,900 $0 Implemented
OR0457 # 04 Y:2004 04 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,100 $42,000 Not Implemented
OR0457 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $31,300 $0 Implemented
OR0457 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,140 $10,000 Not Implemented
OR0457 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,600 $25,000 Implemented
OR0382 # 06 Y:2000 06 2000 ELIMINATE A BY-PRODUCT $68,235 $2,000 Implemented
OR0382 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,241 $6,400 Not Implemented
OR0382 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,050 $4,653 Not Implemented
OR0382 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,194 $2,979 Not Implemented
OR0382 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,208 $26,491 Implemented
OR0382 # 01 Y:2000 01 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $26,817 $900 Implemented
OR0381 # 06 Y:2000 06 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $20,970 $40,500 Not Implemented
OR0381 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,096 $390 Implemented
OR0381 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,850 $8,600 Implemented
OR0381 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $540 $345 Not Implemented
OR0381 # 02 Y:2000 02 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $699 $300 Implemented
OR0381 # 01 Y:2000 01 2000 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $27,260 $0 Implemented
OR0377 # 04 Y:2000 04 2000 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $108,000 $40,000 Implemented
OR0377 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $97,815 $113,670 Not Implemented
OR0377 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,345,966 $600,000 Not Implemented
OR0377 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,486 $0 Not Implemented
OR0371 # 04 Y:2000 04 2000 INCREASE USE OF AUTOMATION $25,665 $2,234 Not Implemented
OR0371 # 03 Y:2000 03 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $142,687 $81,200 Not Implemented