Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 2034 Dehydrated Fruits, Vegetables, Soups
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0377 # 04 Y:2000 04 2000 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $108,000 $40,000 Implemented
OR0377 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $97,815 $113,670 Not Implemented
OR0377 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,345,966 $600,000 Not Implemented
OR0377 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,486 $0 Not Implemented
OR0070 # 08 Y:1989 08 1989 OPTIMIZE PLANT POWER FACTOR $1,625 $3,450 Implemented
OR0070 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,260 $2,000 Implemented
OR0070 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $232 $250 Implemented
OR0070 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,113 $1,204 Implemented
OR0070 # 04 Y:1989 04 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,766 $0 Implemented
OR0070 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,909 $1,090 Implemented
OR0070 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $12,697 $2,400 Implemented
OR0070 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,228 $2,500 Implemented
OR0043 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $433 $908 Implemented
OR0043 # 07 Y:1988 07 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,196 $12,635 Not Implemented
OR0043 # 06 Y:1988 06 1988 OPTIMIZE PLANT POWER FACTOR $2,458 $5,400 Implemented
OR0043 # 04 Y:1988 04 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $1,477 $1,900 Implemented
OR0043 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $1,171 $627 Implemented
OR0043 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $471 $258 Not Implemented
OR0043 # 01 Y:1988 01 1988 USE MINIMUM STEAM OPERATING PRESSURE $506 $0 Implemented
OR0004 # 01 Y:1987 01 1987 USE MINIMUM STEAM OPERATING PRESSURE $617 $0 Not Implemented
OR0004 # 11 Y:1987 11 1987 REDESIGN PROCESS $1,577 $2,610 Not Implemented
OR0004 # 10 Y:1987 10 1987 OPTIMIZE PLANT POWER FACTOR $3,680 $5,110 Implemented
OR0004 # 09 Y:1987 09 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $275 $356 Implemented
OR0004 # 08 Y:1987 08 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,301 $4,205 Not Implemented
OR0004 # 07 Y:1987 07 1987 INSTALL SET-BACK TIMERS $546 $395 Implemented