Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 2034 | Dehydrated Fruits, Vegetables, Soups |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0377 # 04 Y:2000 | 04 | 2000 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $108,000 | $40,000 | Implemented |
OR0377 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $97,815 | $113,670 | Not Implemented |
OR0377 # 02 Y:2000 | 02 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,345,966 | $600,000 | Not Implemented |
OR0377 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,486 | $0 | Not Implemented |
OR0070 # 08 Y:1989 | 08 | 1989 | OPTIMIZE PLANT POWER FACTOR | $1,625 | $3,450 | Implemented |
OR0070 # 07 Y:1989 | 07 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,260 | $2,000 | Implemented |
OR0070 # 06 Y:1989 | 06 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $232 | $250 | Implemented |
OR0070 # 05 Y:1989 | 05 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,113 | $1,204 | Implemented |
OR0070 # 04 Y:1989 | 04 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,766 | $0 | Implemented |
OR0070 # 03 Y:1989 | 03 | 1989 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,909 | $1,090 | Implemented |
OR0070 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,697 | $2,400 | Implemented |
OR0070 # 01 Y:1989 | 01 | 1989 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $13,228 | $2,500 | Implemented |
OR0043 # 05 Y:1988 | 05 | 1988 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $433 | $908 | Implemented |
OR0043 # 07 Y:1988 | 07 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,196 | $12,635 | Not Implemented |
OR0043 # 06 Y:1988 | 06 | 1988 | OPTIMIZE PLANT POWER FACTOR | $2,458 | $5,400 | Implemented |
OR0043 # 04 Y:1988 | 04 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,477 | $1,900 | Implemented |
OR0043 # 03 Y:1988 | 03 | 1988 | INSULATE BARE EQUIPMENT | $1,171 | $627 | Implemented |
OR0043 # 02 Y:1988 | 02 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $471 | $258 | Not Implemented |
OR0043 # 01 Y:1988 | 01 | 1988 | USE MINIMUM STEAM OPERATING PRESSURE | $506 | $0 | Implemented |
OR0004 # 01 Y:1987 | 01 | 1987 | USE MINIMUM STEAM OPERATING PRESSURE | $617 | $0 | Not Implemented |
OR0004 # 11 Y:1987 | 11 | 1987 | REDESIGN PROCESS | $1,577 | $2,610 | Not Implemented |
OR0004 # 10 Y:1987 | 10 | 1987 | OPTIMIZE PLANT POWER FACTOR | $3,680 | $5,110 | Implemented |
OR0004 # 09 Y:1987 | 09 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $275 | $356 | Implemented |
OR0004 # 08 Y:1987 | 08 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,301 | $4,205 | Not Implemented |
OR0004 # 07 Y:1987 | 07 | 1987 | INSTALL SET-BACK TIMERS | $546 | $395 | Implemented |