Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
880
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0861 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,100 | $9,940 | Implemented |
AM0861 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $238,650 | $7,000 | Implemented |
LE0536 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,036 | $2,440 | Implemented |
LE0536 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,791 | $0 | Implemented |
LE0536 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,974 | $35,815 | Implemented |
MA0841 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $253 | $234 | Implemented |
MA0841 # 04 Y:2022 | 04 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,842 | $500 | Implemented |
MA0841 # 03 Y:2022 | 03 | 2022 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $9,761 | $49,341 | Implemented |
MA0841 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,631 | $155,407 | Implemented |
MA0841 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,138 | $8,830 | Implemented |
AS0521 # 06 Y:2022 | 06 | 2022 | USE OPTIMUM THICKNESS INSULATION | $13 | $109 | Implemented |
AS0521 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $191 | $514 | Implemented |
AS0521 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $835 | $814 | Implemented |
AS0521 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,344 | $6,500 | Implemented |
AS0521 # 01 Y:2022 | 01 | 2022 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $52,178 | $1,517 | Implemented |
MA0835 # 04 Y:2022 | 04 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $680 | $750 | Implemented |
MA0835 # 02 Y:2022 | 02 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,773 | $7,150 | Implemented |
MA0835 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,572 | $40,722 | Implemented |
MA0836 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,781 | $625 | Implemented |
MA0836 # 07 Y:2022 | 07 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,777 | $7,150 | Implemented |
MA0836 # 06 Y:2022 | 06 | 2022 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $7,372 | $500 | Implemented |
MA0836 # 05 Y:2022 | 05 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,531 | $1,500 | Implemented |
MA0836 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,895 | $23,950 | Implemented |
LS2215 # 01 Y:2022 | 01 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $50,000 | $0 | Implemented |
LS2215 # 02 Y:2022 | 02 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $9,603 | $1,118 | Implemented |