IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

199

matching recommendations
Reset
SIC 2064 Candy & Other Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0429 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $5,601 Implemented
SF0406 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,385 $0 Implemented
SF0406 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,567 $3,773 Implemented
SF0406 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,401 $0 Implemented
SF0406 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,483 $0 Implemented
UW0041 # 02 Y:2010 02 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $653 $1,306 Implemented
UW0041 # 01 Y:2010 01 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,098 $866 Implemented
UW0041 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $521 $261 Implemented
LE0284 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $224 Implemented
LE0284 # 09 Y:2009 09 2009 REPAIR OR REPLACE STEAM TRAPS $2,855 $2,000 Implemented
LE0284 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,911 $320 Implemented
LE0284 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,628 $1,760 Implemented
UW0013 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Implemented
OR0520 # 01 Y:2007 01 2007 COMBINE UTILITY METERS $33,600 $32,500 Implemented
OR0520 # 07 Y:2007 07 2007 INSULATE FEEDWATER TANK $3,400 $2,160 Implemented
OR0520 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $11,700 $31,650 Implemented
OR0520 # 06 Y:2007 06 2007 REPLACE BOILER $4,900 $5,250 Implemented
OR0520 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $8,600 $17,550 Implemented
OR0520 # 02 Y:2007 02 2007 $15,400 $0 Implemented
OR0520 # 05 Y:2007 05 2007 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $4,800 $6,400 Implemented
CO0592 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $242 $462 Implemented
CO0592 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $270 Implemented
LE0233 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,332 $800 Implemented
LE0233 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $12,000 Implemented
GT0800 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $850 Implemented