IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,585

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0369 # 04 Y:2005 04 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $0 $24,800 Implemented
OR0483 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,960 $3,000 Implemented
OR0483 # 03 Y:2005 03 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $5,100 Implemented
OR0483 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,390 $72,000 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented
OR0483 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $24,290 $4,400 Implemented
OR0483 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $21,624 $0 Implemented
MA0575 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $68,834 $23,508 Implemented
MA0575 # 02 Y:2005 02 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,800 $41,620 Implemented
MA0575 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $517 Implemented
MA0575 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,944 $7,285 Implemented
SU0205 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,784 $0 Implemented
SU0205 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,803 $75 Implemented
SU0205 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $5,926 $1,000 Implemented
SU0205 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $822 $1,010 Implemented
AM0482 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $50,000 $2,000 Implemented
AM0482 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,940 $500 Implemented
AM0482 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,210 $0 Implemented
AM0482 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,020 $0 Implemented
AM0482 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $0 Implemented
AM0482 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $605 $350 Implemented
SF0290 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,309 $0 Implemented
SF0290 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,732 $2 Implemented
SF0290 # 08 Y:2004 08 2004 USE PHOTOCELL CONTROLS $708 $600 Implemented
SF0290 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,885 $6 Implemented